Air Inlet & Pre Filter sets

Year: 2024
Gas Gas Heater Heating Elements

Year: 2024

Installation of Gas Stop/Ratio Valve
(Gas Turbine Power Plant)
Year: 2024

Seamless Tubes/Pipes

Year: 2024
Planned Outage: Basin & Intake
(Auxiliary Cooling Tower)
Year: 2024
Planetry Gearbox

Year: 2024
Supplying Ball Valves

Year: 2024
Inspections for Maintenance Solutions

Year: 2024
LED Display Boards

Year: 2023
Wedge Wire Screens

Year: 2023
Inspections for Maintenance Solutions

Year: 2023
Finned Tubes

Year: 2023

Plant Dismantling Site Reference at Rayong Combined Cycle Plant


Year: 2023

Plant Dismantling Site Reference at Gulf Cogeneration Kaeng Koi 1 Combined Cycle Plant

Year: 2023

Supplying Refurbished Gas Turbine Parts 



Year: 2023 

Supplying, Dismantling and Installing Gas Gas Heating Element (GGH) 

Year: 2023 

Duplex Strainers


Year: 2023
Filter Dewatering Bins

Year: 2023
Installing Flapper Gas Turbine

Year: 2020

Supplying and Installing Separator Vessel

Year: 2020

Fixing Hot Air Leak Sealing

Year: 2020
Supplying Shell and Tube Heat Exchanger


Year: 2020

Supplying Air Cooler and Gas Cooler Product 

Year: 2018 

Installing Finned-Tube


Year: 2017 

Supplying Finned-Tube


Year: 2017 

Supplying, Dismantling, and Installing Gas Gas Heating Element (GGH)

Year: 2017

Designing and Installing Piping System for Sulfuric Acid 98%

Year: 2017 

Supplying and Installing Pneumatic Conveying System

Year: 2016
Supplying and Installing Dust Collector


Year: 2016
Supplying and Installing Blue Silo 


Year: 2015
Supplying and Installing Yellow Silo



Year: 2014
Fixing Gas Gas Heater FGD1 TP1 Frame (งานซ่อมแซม Frame ของ Gas Gas Heater FGD1 TP1)  

Year: 2014
Installing and Testing 0.5 Ton Crane



Year: 2013
Supplying Dismantling and Installing Gas Gas Heating Element (GGH)

Year: 2013

Design and Installation Vacuum Carbon Dioxide

Year: 2010

Fabrication Boiler Buckstay for Thermal Plant

Year: 2010

Fabrication Stack for Power Plant 


Year: 2009

Fixing Casing Leak


Year: 2009

Supplying, Fixing, Purchasing, and Installing
Absorber Agitator Blade

Year: 2009

SOLAR Project Reference
Factory Solar Installation 350 kW

Samut Sakhon
Factory Solar Installation 580 kW

Chachoengsao
Factory Solar Installation 600 kW

Chonburi

Factory Solar Installation 1.7 MW 


Chachoengsao 

Residential Solar Installation


Thailand
Factory Solar - Hybrid Type Installation 15 kW 

Thailand
Factory Solar Farm 2 Sites Installation 100 kW 

Thailand

Factory Solar  Installation

 

Thailand

Residential Solar Installation

 

Thailand

Powered by MakeWebEasy.com
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ นโยบายความเป็นส่วนตัว  and  นโยบายคุกกี้