Installation of Gas Stop/Ratio Valve(Gas Turbine Power Plant)Year: 2024
Plant Dismantling Site Reference at Rayong Combined Cycle PlantYear: 2023
Plant Dismantling Site Reference at Gulf Cogeneration Kaeng Koi 1 Combined Cycle PlantYear: 2023
Supplying Refurbished Gas Turbine Parts Year: 2023
Supplying, Dismantling and Installing Gas Gas Heating Element (GGH) Year: 2023
Supplying and Installing Separator VesselYear: 2020
Supplying Air Cooler and Gas Cooler Product Year: 2018
Installing Finned-TubeYear: 2017
Supplying Finned-TubeYear: 2017
Designing and Installing Piping System for Sulfuric Acid 98%Year: 2017
Design and Installation Vacuum Carbon DioxideYear: 2010
Fabrication Stack for Power Plant
Year: 2009
Fixing Casing Leak
Supplying, Fixing, Purchasing, and InstallingAbsorber Agitator Blade
Factory Solar Installation 1.7 MW Chachoengsao
Factory Solar Installation
Thailand
Residential Solar Installation